On December 16, 2001 the third section of our troop climbing wall
was installed.

The third section is comprised of a wall with two different inclines.

All that remains is the addition of the plywood faces.

The party crew!

Chief Facility Manager cuts a new access hole to the attic.

A view from the balcony